Serving Seattle, Bellevue, Renton, Kent, Shoreline, Burien & nearby King County townsCall (425) 598-0539

Gut jobs and selective tear-outs

Interior Demolition in Seattle, WA

Rooms opened up and cleared for the remodel, with the parts you are keeping protected.

  • Free walkthrough and an itemized written estimate
  • Permit, asbestos notice and side sewer steps planned before work starts
  • Debris sorted for salvage and recycling, not just dumped
Demolition Contractors in Seattle, WA

Clearing the Way for a Remodel

Interior demolition is the careful removal of finishes and non-structural parts of a building while the shell stays standing: cabinets and countertops, tile, flooring, drywall or plaster, fixtures, non-bearing partitions and old built-ins. In Seattle it is the first stage of most kitchen, bath and basement remodels. Done well, it leaves the remodeling crew a clean, open room with the framing, wiring and plumbing exposed and nothing damaged that was meant to stay.

Permit: usually the remodel's, not a demolition permit

SDCI's demolition permit page says partial removal during an alteration, or soft demolition of interior finishes and non-structural partitions, needs only a construction permit. In practice the interior tear-out rides on your remodel permit. Taking out a bearing wall is a structural change that belongs in the remodel plans, so we leave that call to your designer or engineer and work to their drawings.

Older walls, older materials

More than half of Seattle's housing predates 1980, per Point2Homes' Census summary, and many of those homes have plaster over lath, layers of sheet flooring and old pipe or duct insulation. Before tearing into suspect materials, they should be tested. The Puget Sound Clean Air Agency regulates asbestos removal during renovation as well as demolition, and the EPA's Renovation, Repair and Painting rule covers paint disturbance in homes built before 1978. We ask what testing has been done and plan containment and disposal around the results.

How we keep the rest of the house livable

  • Plastic sheeting and zip walls to seal the work area from rooms you are still using
  • Floor protection along the path to the door, and doorway and stair protection
  • Water, gas and power to the work area confirmed off by the right trade before cutting
  • Debris bagged or carted out daily rather than piled in the house
  • Wet cleanup and HEPA vacuuming at the end of each stage

Get a Free Estimate

Selective demolition

Not every job is a full gut. Sometimes it is one wall to open a kitchen to the dining room, a tub surround, a dropped ceiling, or a basement finished in the 1970s that has to come out after water got in. Selective work takes more care than speed: cutting along clean lines, saving trim or flooring that will be reused, and stopping where the plan says to stop.

Sorting what comes out

Interior debris is mixed, but much of it can still be separated. Clean wood, metal from ductwork and fixtures, and cardboard go to recycling. Cabinets, doors and light fixtures in good shape can go to a building salvage outlet. Drywall and tile are bagged and hauled. Seattle's waste rules apply to remodels as well as teardowns, so we keep hauler records with the job file.

Interior Work We Take On

From one wall to a whole floor, priced by the room or by the square foot.

Kitchen tear-outs

Cabinets, counters, backsplash, flooring and soffits removed to the studs.

Bathroom tear-outs

Tubs, showers, tile, vanities and subfloor removed for a new layout.

Basement gut jobs

Wet drywall, framing, carpet and old ceilings cleared out.

Wall and ceiling removal

Non-bearing partitions, plaster, drywall and dropped ceilings taken down.

Flooring removal

Carpet, tile, sheet vinyl and old hardwood pulled and hauled.

Commercial Demolition in Seattle, WA

Typical Interior Demolition Costs

ItemPublished range
Residential interior, per sq ft$2 to $7
Full interior demolition$2,000 to $20,000
Kitchen$500 to $3,000
Bathroom$1,000 to $2,300
Basement$300 to $4,000
Wall removal$300 to $1,000
Drywall removal, per sq ft$0.50 to $1
Dumping fees$200 to $1,000

Figures from HomeAdvisor's interior demolition cost guide (national averages, updated June 2026). Testing, containment and haul distance can change the total. Your written estimate is the price.

How It Works

1. Walkthrough

We mark what goes, what stays and what is being reused, then write the estimate.

2. Prep

Testing results checked, utilities to the area shut off, containment and floor protection set.

3. Tear-out

Finishes and non-structural parts removed, debris carted out daily.

4. Clean handoff

Room swept, vacuumed and ready for the remodeling crew.

House Demolition in Seattle, WA

Why Choose Us for Interior Demolition

Containment first

The work area is sealed before the first cabinet comes off.

Work to your plans

We stop where the remodel drawings say to stop.

Interior Demolition Questions

Does interior demolition need its own permit in Seattle?

Usually not. SDCI says soft demolition of interior finishes and non-structural partitions during an alteration needs only a construction permit, which is normally your remodel permit.

Should I test for asbestos before a kitchen or bath demo?

In an older home, yes. Sheet flooring, mastic, textured ceilings and pipe insulation are common places to find it, and the clean air agency regulates its removal. A test before work starts avoids a mid-job stop.

Can you remove a load-bearing wall?

Removing a bearing wall is a structural change that needs a design and your remodel permit. We do the removal to the engineer's plan once temporary support is in place.

How long does a kitchen tear-out take?

A typical kitchen is often cleared in a day or two once prep is done. Plaster walls, multiple floor layers and tile set in mortar add time.

Interior Demolition in Seattle, WA

Get an Interior Demolition Estimate

Free walkthrough for interior demolition in Seattle homes and businesses.

Call Now: (425) 598-0539